Taiwan area in October the price hike, with international oil prices, oil and electric double up will make up the solar and LED lighting applications, and accelerate the development of Taiwan solar power station, drive the relevant benefit groups.
Taiwan's Ministry of Economic Affairs Bureau of energy was originally provided at least 1 million MW (million watts) solar power system for civil construction, the production value of tens of billions of dollars this year, relaxed to 130MW. Industry analysis, solar power station building once, at least 25 years after the completion of construction of power generation, power generation, to sell electricity to power to make a profit, a total of seven to nine years to recover.
Recently, a number of listed companies, including the national master, Yu crystal, new sun, etc., have been involved in the joint venture or subsidiary of Taiwan solar power generation system and the operation of the establishment.
Mass consumption is rising on the use of LED lighting consciousness, the first wave of price hikes last year has accelerated the use of LED lighting, so in October the price hike will set off another wave of LED lighting to replace the tide. EPISTAR spokesman Zhang Shixian said, enterprises especially need to plant 24 hours of continuous lighting factories and shopping malls lighting, will accelerate the replacement of LED.
Contact: mack
Phone: 13332979793
E-mail: mack@archled.net
Add: 3rd Floor, Building A, Mingjinhai Second Industrial Zone, Shiyan Street, Baoan, Shenzhen,Guangdong,China