Pipeline reporter from the City Project Construction Committee Office was informed that the Harbin before the city will be completed in the second ring road renovation landscape exhibition center, commercial area and provincial Party and government organs, train station, airport, bus station and other important window and the city main roads, neighborhood characteristics based "one ring, three pieces, five line 100 Road (bridge) more than 15000 base lighting facilities, complete the remaining two or three categories of street lamp rectification work before July 30th.
Recently, Harbin Technologies Limited, due to the successful implementation of energy saving project in Xiangfang District, the first quarter gain energy gains over one million yuan into a paragraph. Under their management, the Xiangfang District street lights to save electricity 3 million 550 thousand yuan a year, with an average energy saving rate of more than 50%. The project uses the contract energy management model, the government did not spend a penny.
Last year, I started a street lamp energy-saving renovation project project, Xiangfang District became the first pilot area. Unlike in the past, the project to run the contract energy management mechanism, namely energy-saving based on professional energy services company, only part of the savings to pay by such professional services facilities and services. Through bidding, the city street management office and the energy saving company should be signed by Harbin science and technology co.. The provisions of the contract, the company shall be under the jurisdiction of the investment and energy saving device all installed 310 street lamps, 135 power transformer voltage regulating energy-saving device in Xiangfang District, and is responsible for the maintenance and management of energy saving, the resulting income is divided into three grades, the higher the rate of energy saving, energy saving, more revenue. 5 years after the expiration of the contract, the government to recover the right to operate energy-saving facilities.
Recently, the Municipal Finance Bureau, City Power Supply Bureau, city street management office quarter energy-saving test found that Xiangfang District street lamp energy saving projects last year put into operation in August to February this year, saving about 4000000 kwh, saving electricity 3 million 550 thousand yuan, the average energy saving rate of more than 50%. According to this calculation, the District street lamps can save 8 million 480 thousand kwh per year, saving electricity charges of $7 million 360 thousand, equivalent to standard coal 3392 tons, reducing carbon dioxide emissions by 8454 tons.
According to the contract, the municipal finance will last August to October of 1 million 35 thousand yuan energy allocation of funds allocated to the company should pass. It is reported that in Xiangfang District street lamps installed on the pressure regulator is the company and the Harbin Institute of electrical and Automation Institute jointly developed energy-saving products. At present, the average energy saving rate of domestic street lamp energy saving facilities is about 20% to 30%, and the energy saving rate of the product reaches more than 50%. Industry experts said the move the government to achieve zero investment, zero risk, and in line with the concept of low-carbon climate organization concept.
According to the introduction, the current city road lighting facilities in the main road, Nangang, Xiangfang, Daowai District, cottage 5 1465 street, a total of 86948 street light lamp, street lamp for hardcore 34614 base, 1351 base special cement pole, common rod 5745 base, lamp power point 729 at. Road lighting facilities in our city are street rod body tilt, paint fade, surface contamination; existing street lighting facilities obsolete, affect the use of function; electric energy metering box serious aging, affect the safe operation; street lamp rod hanging advertising box, all kinds of street lights and private bus cable; power lever or the use of special cement rod form broken, missing files empty low illuminance, affect the public convenience etc.. Since April 12th, the city started a comprehensive renovation of street lamps, a total of 12398 street lamp cleaning base, the body of the body righting the base of 2831, more than 230 sets of the installation of the sheath, the replacement of lamps and lanterns 300.
Contact: mack
Phone: 13332979793
E-mail: mack@archled.net
Add: 3rd Floor, Building A, Mingjinhai Second Industrial Zone, Shiyan Street, Baoan, Shenzhen,Guangdong,China